Reach new heights with nord studio's web & mobile solutions.

We design and build web apps, mobile apps and AI systems for founders and teams, scoped to what each project actually needs.

Two people in bright knitwear climbing a tall green ladder, one reaching down to pull the other up.

Web, mobile, AI and design

A small studio that designs, builds and maintains the software itself, whatever the project calls for.

  • Website development
  • Android & iOS development
  • AI & RAG systems
  • UI & product design

Brands we've worked with

  • Yarify
  • B2B Rocket
  • MessageUP
  • Axess
  • Dyzo Media
  • Arthalab Solutions
  • Bizvaarta

Services

Software development services.

Most projects start with one of these and grow into two or three. Web and mobile engineering is the core of what we do, and the design, SEO and AI search work supports whatever gets built.

  • Branding & Identity

    Naming, logo and a visual system that holds together across an app icon, a pitch deck and a shopfront. Usually where we start when the product has no name yet.

    Explore branding
    Nord Studio brand collateral: business cards, a stationery folder, a type specimen and a colour palette laid out together.
  • Web Development

    Marketing sites, dashboards and custom web applications. Built to load fast on a mid-range phone, which is where most of your traffic will open it.

    Explore web development
    A laptop showing a marketing site, ringed by badges reading custom web design, SEO, trusted by many and fast and responsive.
  • Mobile App Development

    iOS and Android apps taken from the first screen through store submission, and through the releases that come after it.

    Explore mobile app development
    A phone app screen reading “Good morning, let’s build”, with a growth chart and a task list beneath it.
  • AI & RAG Development

    Retrieval-augmented assistants and automations that read your own documents, tickets and records. Answers cite where they came from, so someone can check them.

    Explore AI systems
    A translucent AI panel with a search field, a stack of documents behind it and a chat bubble alongside.
  • UI/UX Design

    Wireframes through to a build-ready design system. We draw the error states and the empty screens too, because those are where products lose people.

    Explore UI/UX design
    A phone showing a project dashboard with team activity, a design toolbar and a cursor selecting a panel.
  • SEO & AI Search Optimisation

    Technical SEO, structured data and content architecture, so a site earns Google rankings and gets cited inside AI answers. A smaller part of what we do, usually bolted onto a build.

    Explore SEO
    An SEO panel with a rising green arrow, a magnifying glass over a list of search results and an AI search badge.

Selected work

Projects we have designed and built.

A creator platform, a local shopping app, a WhatsApp marketing tool and an AI journaling app. Here is what each one does and what we did on it.

  1. 01

    Coding Knowledge

    Creator platform · Education

    The website for Coding Knowledge, a programming creator on Instagram. Blogs, notes, ebooks, resume reviews, tools and community links sit in one place, so followers have somewhere to go after a post.

    Instagram followers
    600K+
    Sections on the site
    8

    What we did

    • Web development
    • Information architecture
    • SEO
    Coding Knowledge home page, headed "Industry-Ready Programming & AI Resources".
    Home
    Ebooks
    Blogs
    Resume review
    Tools
  2. 02

    MessageUp

    Android app · Local shopping

    An Android app that puts neighbourhood shops online. Shopkeepers set a delivery radius and list their products. Buyers nearby browse shops, chat with the owner and place orders.

    What we did

    • Brand
    • App design
    • Web
    • Play Store listing
  3. 03

    Bizvaarta

    SaaS · WhatsApp marketing

    A WhatsApp marketing platform for small businesses and agencies, built on the official WhatsApp Business API. We made the marketing site: it explains the product, shows the chatbot and AI lead labelling, and leads to sign-up.

    What we did

    • Web development
    • Conversion design
    • SEO
    The full Bizvaarta landing page, top to bottom.
    Landing page
    Bizvaarta section on WhatsApp AI lead classification, with the chatbot inbox.
    AI chatbot
  4. 04

    Chronists

    AI · Journaling app

    A journaling app with an AI coach for working through stuck thoughts, prompts for when the page is blank, and encrypted private entries. The waitlist site is out while the app is being built.

    What we did

    • Product brand
    • Web
    • Copy
    • Onboarding UX
    Chronists waitlist page, "A calmer journaling experience", over a hillside at dusk.
    Waitlist
    Chronists features overview.
    Features

Start a project

Testimonials

What it is like to work with us.

Founders on what shipping with the studio actually felt like.

  • Rahul FularaFounder, MessageUp
    “I have worked with a lot of developers before, but working with Bhaskar and his team was super smooth. I was initially worried about shipping my app. They did a great job and stayed calm through every change. Looking forward to working with them long term.”
  • Harish BhattFounder and Creator, Coding Knowledge
    “Their service was so good. Good wishes from my side to their team. With a little bit of negotiation we got some extra work in too. Looking forward to working with them again.”
  • Priya RaghavanProduct Lead, Fernwell
    “They took a half-finished idea and gave it a shape we could actually explain to people. The handover was clean, the code was documented, and nothing broke the week after launch.”
  • Joshua
    “Got more than what I expected. Super happy with the results.”
  • Daniel OkonkwoCo-founder, Trailmark
    “What stood out was the pace. We saw something real in the first week, and every round after that answered a question instead of adding one.”

FAQ

The questions buyers actually ask.

The things worth knowing before you send a brief. If yours is not here, ask. A straight answer costs you one email.

How quickly can you start, and how long does a project take?

It depends on the scope. Tell us what you need and by when, and you will get a real timeline before any money changes hands, including a straight no if the date is not achievable.

What actually happens between us sending a brief and seeing the first work?

A short call to pull the brief apart, then a written scope you sign off on: what is being made, what it costs, and when each piece lands. Nothing gets built until that document is agreed, because most projects that go wrong go wrong there.

How many rounds of revisions do we get?

Revisions are written into the scope before the work starts, so you know the number going in. Feedback is collected in one place and answered in one pass. A running trickle of notes is what turns a two-week project into a two-month one.

We only need one thing right now. Is a small project worth your time?

Yes. A single landing page, one screen flow or one integration is fine. Small first projects are how most of our longer engagements started, and neither side has to commit to anything bigger to find out whether the working relationship fits.

What makes Nord Studio different from any other development shop?

The people who design it are the people who build it. Scope gets checked against what is actually buildable while changing it is still cheap, and you talk to the engineers writing the code instead of an account manager relaying it.

We haven't launched yet. Are we too early to work with you?

Early is usually the cheapest time to get this right. Naming, the data model and the first product surface are far less painful to shape before there are customers, a codebase and a year of decisions to undo.

Do you work with clients in other countries and timezones?

Yes. The process is built to run asynchronously, with written scopes, recorded walkthroughs and decisions in writing, so the work moves whether or not both sides are awake at the same time. Calls get booked in whatever window works for you.

What if the work doesn't land the way we imagined?

You see it long before it is finished. Work goes out in stages rather than as one reveal at the end, so a direction that is not right gets caught in week one, while changing it still costs an afternoon.

Rolling green hills under a wide pale sky, with "FAQ" mown into the grass in the valley below.

Book a call

Fifteen minutes to talk it through.

Pick a time that suits you. Tell us what you are building and we will tell you honestly whether we are the right studio for it.